Jacksons and OnPoint Break Ground on DC Fast Charging Stations

Breaking Ground on EV Charging at Jacksons Food Stores

On March 14, 2025, Jacksons Food Stores and OnPoint EV Solutions broke ground on a new set of Level 3 DC fast charging stations. The stations are planned to open in summer 2025 at selected Jacksons locations in Idaho, California, and Washington.

Jacksons Food Stores Announces the Addition of OnPoint EV Super-Fast Level 3 Charging Stations at Selected Stores in California, Idaho and Washington.

Breaking-Ground-Jacksons

OnPoint EV Solutions DC Super-Fast Level 3 EV Charging Stations, which include a Solar Canopy, High Speed Internet Services, Security Cameras and Digital Kiosks integrated with Jacksons Store and OnPoint’s Mobile App.

Initial locations include:

Idaho

  • 612 Northside Blvd, Nampa
  • 3291 E. Pine Street, Meridian
  • 2001 Highway 30 West, Fruitland
  • SE Corner of E Franklin and Star Road, Nampa

California

  • 2281 W Casmalia St, Rialto
  • 1215 Hidden Valley Pkwy, Norco

Washington

  • 2300 Canyon Road, Ellensburg
  • 3709 S Geiger Blvd, Spokane
  • 6606 E Broadway Ave, Spokane Valley

These sites sit along major travel corridors (I-84, I-15, and I-90) and will offer high-power charging with solar canopies, lighting, security cameras, high-speed WiFi, and digital kiosks. Each location will start with four 180 kW dispensers (capable of up to 360 kW for a single vehicle), with both CCS and NACS connectors over time.

Cory Jackson, President of Jacksons Food Stores, said: “Adding EV charging gives more drivers access to the same services our customers already use — fresh food, beverages, clean restrooms, and the rest. EV drivers tend to value innovation, so this fits well with what we offer.”

Rolly Woolsey, CEO of OnPoint EV Solutions, added: “We’re focused on making the charging stop more useful. Drivers will be able to use the OnPoint app to find stations, start sessions, and eventually reserve a stall and connect with Jacksons services.”

The project is being delivered with partners including Uptime Charger, Influent Energy, and Argent Associates. Stations will be available 24/7, accept major payment methods, and are planned to come online beginning summer 2025, with more locations expected later in 2025 and into 2026.

The Jacksons Stores EV Charging Designs

On-Point-Wrap
Charger Design
Pull Thru